Whessoe Road, Darlington, DL3 0QT
+44 (0) 1325 355 141
sales@mechtool.co.uk

Blog

2020 – Penguins Field Development

Fire & Blast Cladding

2020 – HKZ Beta

Fire Walls

2020 – Arctic LNG 2

Blast Walls

2020 – Arctic LNG 2

Fire & Blast Walls

MTE’s Successful Modular Load Out Trial

A successful trial shows that the length of MTE’s road transportable modules despatched from our Darlington factory can now be increased to 21 metres. Loadout validation trials confirmed the results of earlier engineering simulations as part of MTE’s ongoing modular development plans. This welcomed news enables MTE to offer a more cost effective solution for…
Read more

2020 – Arctic LNG 2

Fire & Blast Walls

2020 – Johan Sverdrup P2

Heat Shields

2020 – Arctic LNG 2

Blast Walls

MTE Wins Contract With Shell UK

MTE has been awarded a contract by Shell UK to provide our design and technical expertise to the Clipper Platform, located in the North Sea. MTE’s design and engineering team will produce the design & safety report for some of the existing blast wall panels on the topside structure – MTE originally supplied blast walls…
Read more

MTE & Technomak Announce Strategic Partnership

Mech-Tool Engineering (MTE) and Technomak (TMAK) are thrilled to announce that they have entered a strategic working partnership for the Middle East region which combines the expertise and worldwide experience of the two established companies. TMAK is an integrated engineering, design, fabrication & erection company with a long established and considerable project management, engineering and…
Read more