Project
Johan Sverdrup Development – Phase II
Client
Aibel
Operator
Equinor (Statoil)
Scope of Work
Phase 2 External Walls
Johan Sverdrup Development – Phase II
Aibel
Equinor (Statoil)
Phase 2 External Walls
Mech-Tool Engineering Ltd, Whessoe Road Darlington, England
DL3 0QT
+44 (0)1325 355 141 sales@mechtool.co.uk
© 2022 Mech-Tool Engineering Ltd. Built using WordPress and the Highlight Theme