Whessoe Road, Darlington, DL13 0QT
+44 (0) 1325 355 141
sales@mechtool.co.uk

ExxonMobil starts production at Arkutun-Dagi field

ExxonMobil has started light oil production from the Sakhalin-1 project’s Arkutun-Dagi field offshore eastern Russia.

The Arkutun-Dagi field offshore Sakhalin started light oil production according to a recent report. Read more here http://www.offshore-mag.com/articles/2015/01/exxonmobil-starts-production-at-arkutun-dagi-oil-field-offshore-sakhalin-eastern-russia.html

Mech-Tool Engineering Ltd (MTE) was privileged to work on this prestigious project for more than 4 years. MTE designed, engineered and manufactured the firewalls and blastwalls at its fabrication facility in Darlington, and procured doors and windows from world leaders in the supply of these products.

The walls were shipped from MTE factory in Darlington and doors and windows from world-wide locations under MTE project management to Daewoo Heavy Industries’ Okpo yard, in South Korea, for final assembly.

 Another well executed project by Mech-Tool Engineering Ltd.

%d bloggers like this: