Project
Ichthys LNG
Client
AG&P
Operator
–
Scope of Work
25,000m2 of carbon steel fire and blast walls, which were used to clad a series of LER and LIER modules.
Ichthys LNG
AG&P
–
25,000m2 of carbon steel fire and blast walls, which were used to clad a series of LER and LIER modules.
Mech-Tool Engineering Ltd, Whessoe Road Darlington, England
DL3 0QT
+44 (0)1325 355 141 sales@mechtool.co.uk
© 2022 Mech-Tool Engineering Ltd. Built using WordPress and the Highlight Theme